Minimum Pitch for Generic Metal Roofing
Minimum Pitch for Generic Metal Roofing
Profile | Min Height | Min Pitch | Check Capacity after run of... |
---|---|---|---|
Trapezoidal Asymmetrical | 20 | 4° | 20 m |
27 | 3° | 40 m | |
36 | 3° | 65 m | |
Trapezoidal Symmetrical | 20 | 4° | 15 m |
30 | 4° | 25 m | |
Secret Fix | 30 | 3° | 60 m |
25 | 3° | 30 m | |
Standing Seam | 30 | 3° | 85 m |
25 | 3° | 35 m | |
Corrugate | 16.5 | 8° | 15 m |
21 | 4° | 20 m | |
35 | 3° | 65 m |
Clause Number:
7.1.1A
/cop/roofing/roof-pitch#minimum-roof-cladding-pitch+minimum-pitch-generic-metal-roofing
Revision Category:
2 - Editing and rearrangement
- Log in to post comments