Menu

Maximum Valley Catchment in m² for Areas Having a 50-year Rainfall Intensity <150 mm/h

Maximum Valley Catchment in m² for Areas Having a 50-year Rainfall Intensity <150 mm/h

Roof Pitch10°12.5°1520°25°30°
A 3-fold  1218294170106146
B standard  2534476399140184
C Deep6086152180215251321389452
D Tile    1722334557
Free Board: 15 mm for pitches 8° and above
                      20 mm for pitches below 8°
Clause Number: 
5.5.2C
/cop/roof-drainage/valleys#valley-design+maximum-valley-catchment-m²-areas-having-50-year-rainfall-intensity